| Development Region | Central Development Region |
|---|---|
| District | Lalitpur |
| Location of Project Site | Bhattedanda, Sankhu VDC |
| Water Source | Tungun and Thosne Khola |
| Type of Scheme | RoR |
| Access Road | Kanti Rajpath |
| Maximum Capacity | 4362 kW |
| Gross head | 167.6 m |
| Rated Design head | 164.7 m |
| Design Discharge | 3.18 cumecs |
| River | Main River |
|---|---|
| Catchment Area at Intake | 48 sq km |
| Average Precipitation | 3000 mm/year |
| Minimum Monthly flow | 0.421 m3/sec |
| Max Contribution to Design Discharge | 3.18 cumecs |
| 100 year flood at headwork | 254 cumecs |
TUNGUN KHOLA (Collection, Tributary 2) | |
| Catchment Area at Intake | 41 sq km |
| Average Precipitation | 3000 mm/year |
| Minimum Monthly flow | 0.378 m3/sec |
| Max Contribution to Design Discharge | 1.15 cumecs |
| 100 year Flood at Headworks | 228 cumecs |
| Purpose | Collection Intake for low flow only |
|---|---|
| Diversion structure | Stone lined free flow weir |
| Length of weir | 20m |
| Weir crest elevation | EL 1142.7 msl |
| Height of weir | 1.5m |
| Under sluice | 1 Vertical Sluice gate |
| Crest of Sluice | EL 1141.29msl |
| Size of Sluice gates (bxh) | 1.5m x 1.5m |
| Intake Type | Side Intake with course rack |
| Size of opening | 2.0x 0.7x 2 nos |
| Crest elevation of Intake | EL1142.2 msl |
| Canal Type | Rectangular RCC closed canal |
|---|---|
| Dimension (width x height) | 1.2 m x 1.0m |
| Length of Channel | 85.17 m |
| Bed Slope | 1:250 |
| Type | RCC Rectangular x 2 basins |
|---|---|
| Dimension (width x height) | 2.4 m x2.2-2.6 m |
| Length of effective basin | 24 m |
| Length of Inlet Transition | 12 m |
| Length of outlet Transition | 6 m |
| Bed Slope | 1in 50 |
| Particle to settle | 0.50 mm |
| Total Conveyance | 3452.00 m |
|---|---|
| Type | Mild Steel Welded Pipe |
| Diameter | 0.9m Internal Dia |
| Thickness of Pipe | 6mm |
| Average Pipe slope | 1:250 |
| No of Air release Valve | 1 |
| No of Wash Plug | 1 |
| No of IP | 51 |
| Diversion structure | Stone lined free flow weir |
|---|---|
| Length of weir | 16m |
| Weir crest elevation | EL 1126.2 msl |
| Height of weir | 1.2m |
| Undersluice | 1 Vertical Sluice gate |
| Crest of Sluice | EL 1124.2 msl |
| Size of Sluice gates (bxh) | 2m x 1.5m |
| Intake Type | Side Intake with Double Orifice |
| Size of opening | 1.7x 1.0x 3 nos |
| Crest elevation of Intake | EL1125.4 msl |
| Canal Type | Rectangular RCC closed canal |
|---|---|
| Dimension (width x height) | 2 m x 1.2m |
| Length of Channel | 17.5 m |
| Bed Slope | 1:250 |
| Canal Type | Rectangular RCC Channel |
|---|---|
| Dimension (width x height) | 4.3x 1.4-2.4 m |
| Bed Slope | 1:15 |
| Length of Gravel Trap | 18 m |
| Particle to settle | 20 mm |
| Type | RCC Dufore x 2 basins |
|---|---|
| Dimension (width x height) | 5.0 m x 4.2-5.3 m |
| Length of effective basin | 52 m |
| Length of Inlet Transition | 10.5 m |
| Length of outlet Transition | 6 m |
| Bed Slope | 1in 50 |
| Particle to settle | 0.20 mm |
| Trap Efficiency | 93% |
| Tunnel Type | Free Flow Inverted D type 2.0m dia |
|---|---|
| Type of lining | Shotcrete Lined |
| Flow Section | 2x1.2 rectangular |
| Slope of HR tunnel | 1:500 |
| Length of Tunnel | 588m |
| Rock Trap | 10m |
| Type | Rectangular sump with extension on Tunnel |
|---|---|
| Construction | Concrete Lined at joint of pipe with bellmouth |
| Dimension | 10.8x 4x 1.2-4.5m |
| Height of the tank from Invert level | 8.7m |
| Invert Level | 1120.30m |
| Type | Welded Surface Penstock |
|---|---|
| Pipe Material | Mild steel confirming to IS 2062-B |
| Length of penstock | 285m |
| Size of Pipe | 1.424-1.0m, 8-14mm thick |
| Supports | S/M Support with Concrete cap |
| Number of supports | 20 nos |
| Number of Anchor Blocks | 7 nos. including Y |
| Type | Surface with outdoor switchyard |
|---|---|
| PH dimension (l x b) | 35 x 10.8 m |
| Height of PH building | 9 m |
| PH Floor level | EL. 957.46 m |
| Switchyard | Outdoor type (25x12m) |
| Type | Rectangular RCC |
|---|---|
| Size | 2x1.6 m |
| Length | 12m |
| Tailrace canal invert level | EL 954.59 m |
| Number of Units | 2 |
|---|---|
| Type of Turbine | Pelton |
| Shaft Arrangement | Horizontal |
| Rated discharge for each turbine | 1.59 m3/s for each units |
| Rated Head | 164.7m |
| Rated Output for each unit | 2300 kW each unit |
| RPM | 600 |
| Rated Efficiency | 89% |
| Speed Governor | Electro-Hydraulic |
| No of units | 2 |
|---|---|
| Generator Type | 3 ph AC Synchronous |
| Excitation | Brushless excitation |
| Rated Voltage | 6.3 kV |
| Power Factor | 0.8 |
| Layout | Horizontal |
| Rated Output | 2700 kVA each |
| Rated Frequency | 50 Hz |
| Type | Outdoor type, Oil Immersed |
|---|---|
| Capacity | 5600 kVA |
| Quantity | 1 |
| Number of Phases | 3 ph, 50 Hz |
| Type of Cooling | ONAN |
| Voltage Ratio | |
| Primary (LV Side) | 6.3 kV |
| Secondary (HV Side) | 33 kV |
| Type | Outdoor type |
|---|---|
| Capacity | 100 kVA |
| Quantity | 1 |
| Number of Phases | 3 ph, 50 Hz |
| Type of Cooling | ONAN |
| Voltage Ratio | 33/0.4 kV |
| Connection /Vector Group | Dyn11 |
| Transmission Length Tungun-Thosne PH- Unichaur SS | 7.708km |
|---|---|
| Unichaur SS- Lagankhel SS | 20.318 km |
| Transmission Voltage | 33 kV |
| Type of Circuit | Single circuit line up to Lagankhel SS |
| Interconnection Voltage | 11 kV |
| Proposed Interconnection Point | NEA 66/11 kV, Substation at Lagankhel |
| Line Conductor | ACSR, 100 mm2 |
Kulekhani Option | |
| Transmission Length Tungun-Thosne PH- Khani PH | 2.5km |
| Khani PH – Kulekhani SS | 21km |
| Transmission Voltage | 33 kV |
| Type of Circuit | Single circuit line up to SS |
| Interconnection Voltage | 66kV |
| Proposed Interconnection Point | NEA 66kV, Switchyard at KL-1 |
| Line Conductor | ACSR, 100 mm2 |
| Installed Capacity | 4.3 MW |
|---|---|
| Deemed Energy | 22.92 GWh |
| Dry Season Energy (four months) | 3.25 GWh |
| Wet Season Energy (eight months) | 18.30 GWh |
22. Development & Construction Period |
1+2 years |
|---|
| Base Cost of the Project | NRs 584.465 million (with IDC) Considering Connection at KL1 and cost shearing with Laxmi Cement) |
|---|---|
| Loan/Equity Ratio | 11 % |
| IRR | 13.76% |
| B/C Ratio | 1.23 |
| EIRR | 17.33 % |
| Simple Payback Period | 6.5 years |
| Cost per kW | U$ 1865 (1 US $ = NRs. 77) |